Switchgear Selection in EPC Projects: A Practical Guide for Electrical Engineers
Introduction
Switchgear selection in EPC projects is an important step in electrical system design.
After preparing the load list and developing the Single Line Diagram (SLD), the electrical engineer needs to determine what type of switchgear is required, its voltage rating, current rating, short-circuit rating, protection requirements and construction.
In a typical EPC project, switchgear may include:
- LV Switchboard
- PCC — Power Control Centre
- MCC — Motor Control Centre
- MDB — Main Distribution Board
- SMDB — Sub-Main Distribution Board
- ACDB — AC Distribution Board
- MV Switchgear
- ACB — Air Circuit Breaker
- MCCB — Molded Case Circuit Breaker
- VCB — Vacuum Circuit Breaker
- Isolators and disconnectors
- Protection relays
- CTs and VTs
Switchgear selection should not be based only on the connected load. Voltage, continuous current, short-circuit level, protection philosophy, installation conditions and project specifications all need to be considered. (ZY POWER)
1. What Is Switchgear?
Switchgear is a combination of electrical equipment used to switch, control, protect, isolate and distribute electrical power.
A simple power flow can be represented as:
TRANSFORMER
|
|
+----+----+
| INCOMER |
| ACB |
+----+----+
|
|
=================
BUSBAR
=================
| | |
| | |
MCCB MCCB MCCB
| | |
LOAD LOAD MOTORThe switchgear provides a controlled point between the power source and downstream loads.
If a fault occurs downstream, the protective device should operate and disconnect the affected circuit.
2. Where Does Switchgear Selection Come in an EPC Project?
This is important for an electrical designer to understand.
A simplified EPC electrical design sequence is:
LOAD LIST
|
↓
LOAD ESTIMATION
|
↓
TRANSFORMER SIZING
|
↓
SLD DEVELOPMENT
|
↓
SWITCHGEAR SELECTION
|
+---------+---------+
| |
↓ ↓
BREAKER SELECTION BUSBAR SIZING
|
↓
CABLE SIZING
|
↓
CABLE SCHEDULE
|
↓
CABLE ROUTING
|
↓
CABLE TRAYSo, switchgear selection is not an isolated activity.
It is connected to the transformer, SLD, short-circuit calculation, protection coordination and cable system.
3. First Step — Determine the System Voltage
The first question is:
What voltage level will the switchgear operate at?
For example:
UTILITY / GRID
|
11 kV
|
+--------------+
| 11 kV SWITCH |
| GEAR |
+------+-------+
|
TRANSFORMER
11 kV / 415 V
|
+------+-------+
| LV SWITCHGEAR|
| 415 V |
+------+-------+
|
LOADSThe voltage level determines the switchgear family and applicable standards.
For example:
| Application | Typical Voltage | Typical Equipment |
|---|---|---|
| LV distribution | 400/415 V | LV Switchboard |
| Motor distribution | 400/415 V | MCC |
| MV distribution | 3.3 kV | MV Switchgear |
| MV distribution | 6.6 kV | MV Switchgear |
| MV distribution | 11 kV | MV Switchgear |
| MV distribution | 33 kV | MV Switchgear |
For LV assemblies, IEC 61439 is a key standard family. For MV metal-enclosed switchgear, IEC 62271 is commonly applicable. The exact project specification and local requirements must always be checked. (Electrical Installation)
4. Second Step — Calculate the Load Current
Once the voltage is known, determine the expected operating current.
For a three-phase load:
Where:
- I = Current in amperes
- P = Power in watts
- V = Line-to-line voltage
- PF = Power factor
Example
Suppose a plant load is:
- Power = 500 kW
- Voltage = 415 V
- Power factor = 0.9
Then:
Approximately:
The switchgear and incomer therefore need to be selected to safely carry the required continuous current, with the actual project design accounting for demand, diversity, temperature and other applicable derating factors.
5. Connected Load Is Not the Same as Maximum Demand
This is a very important EPC concept.
Suppose a panel has:
Motor 1 100 kW
Motor 2 100 kW
Motor 3 100 kW
Heater 50 kW
Lighting 20 kW
---------------------
Connected Load = 370 kWIt does not automatically mean that all loads operate simultaneously at their full rating.
The electrical engineer therefore considers:
- Demand factor
- Diversity factor
- Load factor
- Operating conditions
- Future loads
- Standby equipment
- Motor starting requirements
The resulting design load is used for downstream sizing calculations.
6. Third Step — Determine the Short-Circuit Level
This is one of the most important parts of switchgear selection.
A switchboard may carry only 800 A during normal operation, but during a fault, the current can become many times higher.
For example:
NORMAL OPERATION
Transformer
|
| 800 A
↓
+-----------+
| SWITCHGEAR|
+-----------+
|
LOADDuring a short circuit:
TRANSFORMER
|
| VERY HIGH FAULT CURRENT
↓
+----------------+
| SWITCHGEAR |
| |
| SHORT CIRCUIT|
| FAULT |
+----------------+Therefore, the switchgear must have suitable short-circuit withstand and switching capabilities.
The fault level is obtained from the short-circuit study.
7. Why Fault Level Is Important
Consider two panels.
Panel A
Load Current = 800 A
Fault Level = 20 kAPanel B
Load Current = 800 A
Fault Level = 50 kABoth panels carry the same normal current.
But their short-circuit requirements are different.
Therefore:
You cannot select switchgear only from the load current.
The short-circuit level at the installation point must also be checked.
For LV systems, parameters such as Icu, Ics and Icw may be relevant depending on the equipment and application. For MV circuit breakers, rated short-circuit breaking current and short-time withstand characteristics are among the parameters considered. (ZY POWER)
8. Understanding Icu and Ics
For an LV circuit breaker, two important terms are:
Icu — Ultimate Breaking Capacity
Icu represents the maximum prospective short-circuit current that the circuit breaker is rated to interrupt under the applicable standard conditions.
Ics — Service Breaking Capacity
Ics relates to the short-circuit current the breaker can interrupt while maintaining the specified service capability according to the standard.
A simple way to remember:
Icu
↓
Maximum ultimate fault interruption capability
Ics
↓
Service-level fault interruption capabilityThese values should be checked against the calculated fault level and the project protection philosophy.
9. Fourth Step — Select the Incomer Breaker
After determining the required current and fault level, the incomer breaker can be selected.
For an LV main switchboard, an ACB may be used as the incomer.
Example:
TRANSFORMER
1000 kVA
|
|
+----+----+
| ACB |
| INCOMER |
+----+----+
|
=================
BUSBAR
=================
| | |
ACB MCCB MCCB
| | |
MCC DB MOTORThe ACB selection may include:
- Rated current
- Breaking capacity
- Short-time withstand
- Trip unit
- Long-time protection
- Short-time protection
- Instantaneous protection
- Earth-fault protection
- Under-voltage protection
- Over-voltage protection
- Communication
- Motorized operation
The actual functions depend on the project protection philosophy.
10. MCCB Selection for Outgoing Feeders
MCCBs are commonly used for outgoing LV feeders.
For example:
LV SWITCHBOARD
|
+-----+-----+
| BUS |
+-----+-----+
|
+------------+------------+
| | |
MCCB MCCB MCCB
| | |
Motor Panel HeaterThe MCCB rating should be coordinated with:
- Load current
- Cable ampacity
- Fault level
- Starting current
- Protection requirements
- Selectivity
- Coordination with upstream/downstream devices
11. Cable and Breaker Selection Are Connected
This is extremely important for EPC designers.
Consider:
SWITCHBOARD
|
MCCB
|
|
CABLE
|
|
MOTORThe breaker cannot simply be selected independently from the cable.
Suppose:
Load current = 180 A
Cable capacity = 220 AA suitable protective device needs to be selected so that the cable is properly protected while the load can operate normally.
Therefore:
LOAD
↓
LOAD CURRENT
↓
CABLE SIZE
↓
BREAKER RATING
↓
PROTECTION SETTINGThe exact selection must follow the applicable installation standard, project requirements and coordination study.
12. Busbar Selection
Switchgear selection also involves busbar sizing.
For example:
INCOMER
|
|
=================
BUSBAR
=================
| | |
| | |
MCCB MCCB MCCBThe busbar must be capable of carrying the required continuous current.
Typical considerations include:
- Rated current
- Temperature rise
- Short-time withstand current
- Peak withstand current
- Ambient temperature
- Enclosure arrangement
- Busbar material
- Installation configuration
For LV assemblies, IEC 61439 includes requirements relating to current-carrying capability, temperature rise and short-circuit performance. (Electrical Installation)
13. Fixed or Withdrawable Switchgear?
Another important EPC decision is construction type.
Fixed Type
The switching device remains installed in its operating position.
+----------------+
| SWITCHGEAR |
| |
| BREAKER |
| FIXED |
| |
+----------------+Withdrawable Type
The breaker or functional unit can be moved between positions.
+----------------------+
| SWITCHGEAR |
| |
| [ BREAKER ] ←→ |
| |
+----------------------+Withdrawable construction can provide operational and maintenance advantages where the project requires reduced downtime or easier isolation.
The choice depends on:
- Criticality
- Maintenance philosophy
- Availability requirements
- Space
- Cost
- Project specifications
14. Form of Separation
For LV switchboards, the internal separation arrangement is another important specification.
A simplified concept is:
FORM 1
-----------------
Common enclosure
FORM 2
-----------------
Busbar separated
FORM 3
-----------------
Busbar + functional units
separated
FORM 4
-----------------
Busbar + functional units
+ terminals separatedThe required form depends on the project’s safety, maintenance and operational requirements.
IEC 61439 addresses functional units and forms of separation in LV assemblies. (Electrical Installation)
15. IP Rating
The switchgear enclosure also needs an appropriate IP rating.
IP rating indicates the degree of protection provided by the enclosure against ingress of solids and water.
For example:
Indoor Electrical Room
↓
Suitable IP rating
Outdoor Installation
↓
Higher environmental
protection may be requiredThe selection depends on:
- Indoor/outdoor installation
- Dust
- Water
- Humidity
- Process environment
- Corrosive atmosphere
- Project specification
Do not simply select an IP rating from a standard template. It should match the actual installation environment.
16. Environmental Conditions
Switchgear may be installed in:
- Indoor electrical rooms
- Outdoor substations
- Process areas
- Coastal environments
- Dusty industrial areas
- High-temperature locations
Therefore, check:
Ambient temperature
↓
Altitude
↓
Humidity
↓
Dust
↓
Corrosion
↓
Installation location
↓
Enclosure / derating requirementsEnvironmental conditions can affect enclosure design, thermal performance, insulation and material selection. (Cneeg)
17. Protection Coordination
Switchgear selection cannot be separated from protection coordination.
Consider:
INCOMER ACB
|
|
MCCB-1
|
MCCB-2
|
MOTORIf a fault occurs at the motor:
MOTOR FAULT
↓
MCCB-2 SHOULD TRIP
↓
MCCB-1 SHOULD REMAIN ON
↓
INCOMER SHOULD REMAIN ONThe objective is generally to disconnect the affected portion while maintaining supply to healthy portions of the system, subject to the project’s protection philosophy.
This is called selectivity/discrimination.
18. Protection Relay Selection for MV Switchgear
For MV switchgear, protection relays are commonly used.
A simplified arrangement:
11 kV INCOMING
|
VCB
|
+-----+-----+
| CT / VT |
+-----+-----+
|
PROTECTION
RELAY
|
TRIP SIGNAL
|
VCBThe relay may provide functions such as:
- Overcurrent protection
- Earth-fault protection
- Under-voltage
- Over-voltage
- Transformer protection
- Motor protection
- Directional protection
The exact protection functions depend on the electrical system and protection study.
19. CT and VT Selection
Switchgear can also include:
CT — Current Transformer
Used for:
- Protection
- Metering
- Monitoring
VT/PT — Voltage Transformer
Used for:
- Voltage measurement
- Protection
- Metering
- Synchronization where required
Example:
11 kV BUS
|
+--------+--------+
| |
CT VT
| |
↓ ↓
PROTECTION METERING
RELAY /RELAYCT and VT specifications should be coordinated with the protection and metering requirements.
20. Switchgear Selection Data Sheet
In an EPC project, the engineer may prepare a switchgear technical specification/datasheet containing parameters such as:
| Parameter | Example |
|---|---|
| System Voltage | 415 V |
| Frequency | 50 Hz |
| Phases | 3 Phase |
| System | 4 Wire |
| Rated Current | 2000 A |
| Short-Circuit Rating | Project calculated value |
| Incomer | ACB |
| Outgoings | MCCB/ACB |
| Busbar | Copper/Aluminium |
| Form of Separation | Project specified |
| IP Rating | Project specified |
| Installation | Indoor |
| Ambient Temperature | Project specified |
| Control Voltage | 110/230 V AC or 24 V DC |
| Communication | Modbus/other project protocol |
| Protection | LSIG / relay functions as applicable |
The values above are illustrative only. Actual values must come from the project’s electrical studies and specifications.
21. Documents Used for Switchgear Selection
As an EPC electrical designer, you will normally work with several documents.
1. Load List
Provides:
- Equipment loads
- Motor ratings
- Operating loads
- Voltage
- Power factor
- Starting information
2. Single Line Diagram
Shows:
SOURCE
↓
TRANSFORMER
↓
SWITCHGEAR
↓
BREAKERS
↓
CABLES
↓
LOADS3. Short-Circuit Study
Provides the fault level required for equipment selection.
4. Protection Coordination Study
Helps determine:
- Breaker settings
- Relay settings
- Selectivity
- Protection philosophy
5. Cable Schedule
Provides:
- Cable size
- Number of runs
- Cable type
- From/To information
6. Project Electrical Design Criteria
Defines project-specific requirements.
22. Practical EPC Example
Let’s take a simple example.
Suppose an industrial plant has:
UTILITY
|
| 11 kV
↓
11 kV SWITCHGEAR
|
↓
11/0.415 kV TRANSFORMER
|
↓
415 V LV SWITCHBOARD
|
+------------+-------------+
| | |
MCC DB MCC
| | |
Motors Lighting MotorsThe electrical engineer follows this sequence:
Step 1 — Load List
Determine all connected loads.
Step 2 — Maximum Demand
Determine the expected operating demand.
Step 3 — Transformer
Select transformer rating.
Step 4 — Short-Circuit Calculation
Determine fault current at the relevant switchboards.
Step 5 — Switchgear
Select:
- Voltage rating
- Current rating
- Short-circuit rating
- Construction
- Busbar rating
- IP rating
- Protection
Step 6 — Breakers
Select ACB/MCCB/VCB as applicable.
Step 7 — Cable Sizing
Select cables based on:
- Current capacity
- Voltage drop
- Short-circuit withstand
- Installation conditions
Step 8 — Cable Schedule
Prepare the cable schedule.
Step 9 — Cable Routing
Route cables through trays.
This is how the different electrical engineering activities connect together in an EPC project.
23. Simple Switchgear Selection Flowchart
LOAD LIST
|
↓
SYSTEM VOLTAGE
|
↓
LOAD CURRENT
|
↓
MAXIMUM DEMAND
|
↓
SHORT-CIRCUIT STUDY
|
↓
┌─────────────────┐
│ SWITCHGEAR TYPE │
└────────┬────────┘
|
+-------+-------+
| |
LV MV
| |
ACB/MCCB VCB + RELAY
| |
+-------+-------+
|
↓
BUSBAR RATING
|
↓
PROTECTION SYSTEM
|
↓
ENVIRONMENT / IP
|
↓
CONSTRUCTION TYPE
|
↓
PROJECT SPECIFICATION
|
↓
FINAL SWITCHGEAR24. Common Mistakes in Switchgear Selection
Mistake 1 — Selecting only based on load current
❌ “Load is 500 A, so select a 500 A panel.”
You must also consider fault level, environmental conditions, protection and project requirements.
Mistake 2 — Ignoring short-circuit current
A panel with adequate normal current rating can still be unsuitable if its short-circuit capability is inadequate.
Mistake 3 — Ignoring cable coordination
The breaker, cable and load must work together.
Breaker
↓
Cable
↓
LoadMistake 4 — Ignoring protection coordination
Selecting breakers without checking upstream/downstream coordination can cause unnecessary shutdown of larger parts of the plant.
Mistake 5 — Ignoring future expansion
Some EPC projects require spare feeders or additional capacity.
Future requirements should be identified from the project specification rather than adding an arbitrary percentage.
Mistake 6 — Ignoring environmental conditions
A switchboard installed inside a clean electrical room and one installed outdoors in a harsh environment may require very different enclosure and environmental considerations.
25. Important Standards
Some commonly referenced standards include:
| Equipment / Area | Common IEC Reference |
|---|---|
| LV Switchgear Assemblies | IEC 61439 |
| LV Circuit Breakers | IEC 60947-2 |
| MV Switchgear | IEC 62271 series |
| MV Circuit Breakers | IEC 62271-100 |
| IP Protection | IEC 60529 |
The applicable edition, project specification, local regulations and client requirements should always be checked before final engineering. (Electrical Installation)
26. Switchgear Selection — The Easy Way to Remember
As an EPC electrical engineer, remember these 8 questions:
1. WHAT VOLTAGE?
↓
2. WHAT LOAD CURRENT?
↓
3. WHAT FAULT LEVEL?
↓
4. WHAT BREAKER?
↓
5. WHAT BUSBAR RATING?
↓
6. WHAT PROTECTION?
↓
7. WHAT ENVIRONMENT / IP?
↓
8. WHAT PROJECT REQUIREMENTS?If you can answer these questions, you have the foundation for understanding switchgear selection.
27. How Switchgear Connects to the Next EPC Design Activities
The overall relationship can be remembered like this:
LOAD LIST
|
↓
LOAD ESTIMATION
|
↓
TRANSFORMER SIZE
|
↓
SLD
|
↓
SWITCHGEAR SELECTION
|
↓
BREAKER SELECTION
|
↓
CABLE SIZING
|
↓
CABLE SCHEDULE
|
↓
CABLE ROUTING
|
↓
CABLE TRAY DESIGN
|
↓
TRAY SUPPORT DESIGNThis sequence is especially useful for a designer who wants to understand how an EPC electrical design develops from the load list into the final 3D model.
Conclusion
Switchgear selection in EPC projects is much more than choosing a panel or circuit breaker from a catalogue.
The engineer must consider:
- System voltage
- Load current
- Maximum demand
- Short-circuit level
- Breaker rating
- Busbar rating
- Protection coordination
- Cable coordination
- Construction type
- Form of separation
- IP rating
- Environmental conditions
- Future requirements
- Project specifications
- Applicable IEC standards
The most important concept to remember is:
Load current tells you what the switchgear normally carries; fault-level calculations tell you what it may need to withstand or interrupt during a fault.